LX CABLE's BOMFLEX Service

A solution from BOM list to site delivery.

Home

>

One Stop Solution

Do You Face These Cable Procurement Challenges?

  1. Local procurement is too expensive?
  2. Have problem in managing too many oversea suppliers?
  3. Have trust problem with new suppliers?
  4. Need faster delivery?
  5. Need a hub for shipment consolidation?

What is BOMFLEX?

BOMFLEX is a BOM procurement & management service developed by LX Cable. This service is to wrap the complex issues which happens during a project procurement from China, into a simple and agile solution package.

BOMFLEX is now focusing on serving Solar, Power and Telecom Projects.

What is Included?

  • Manufacturing of Cables & Cable Accessories
  • Procurement of items base on project BOM list
  • Consolidation of Items into LX warehouse
  • Re-Packing & container loading optimization
  • Standardized Shipment Inspection
  • Shipment Delivery Management to Destination Port/Site
  • Warranty and After sale Service

MAIN ITEMS COVERED

  • Cables & Cable connection
  • Hardware
  • Cable Ducting and Trays
  • Lighting protection and Grounding Materials
  • Overhead Powerline Accessories
  • End-customer Connection and Drop line Accessories
  • Tools

Why BOMFLEX?

BOMFLEX Service has been Verified by the market and Acknowledged by our customers for 5 years.

cost saving
fast delivery
customs clearance
900x600
900x600

1. Cost Saving

Comparing with procurement in local, BOMFLEX help our customer saves 30% of their total budget.

Why we are able to do that???
(1) LX Group owned it’s cable factory, which can manufacture cables and cable accessories by itself
(2) Has a very reliable supplier base in local which has been developed for years
(3) Has a very efficient system to minimize local transportation cost during consolidation of items

2. Fast Delilvery

After continuous optimization and iteration, we are cutting the delivery time in half. Now we are able to manage shipments ready for delivery:
Within 2 weeks for a standard micro grid solar project (<1MW)
Within 3 weeks for a small solar project (<5MW)

3. Low MOQ

Thanks to a well developed stock control system that link to our cable production department and accessories suppliers, BOMFLEX now supports very low MOQ for smaller projects.

4. Reliable Delivery

10+ electrical & quality engineers in a technical support team, provides reliable quality assurance
Standardized Internal IQC Process
Standardized Packing & Label
At least one year warranty policy

5.Team Support

We have an independent department including experienced project managers and technicians to support you
Quick quote
Clear and Detailed Technical Confirmation
Transparent, agile and timely communication

Proven Expertise Through Real-World Cable Projects

Discover how our extensive experience in cable projects has delivered reliable solutions, overcoming procurement challenges and ensuring quality and efficiency in every step.

Solar Power Plant

Solar Power Plant

Project Name: RREP Project l&

Project Scale: Solar Mini Grid

Material Supplied: LV/DC Cables/Distribution Materials/Tools

Year of Supplied: 2023

Location: Sierra Leon

Description: The project was developed in 2 Phases, when we received the PO of the 1st Phase, customer required us to deliver within 14 days for 50+ items, which is quite challenging.

The LX team immediately took the task. With the great effort and also due to high efficiency of the system, we finally get all materials ready within 10 days.

Now we have delivered all material for 2 Phases, and according to feedback from commissioning of the 1st Phase, customer is happy with the service.

Transmission Line Upgrade

Transmission Line Upgrade

Project Name: Bamburi Cement Project

Project Scale: Solar farm for Industry

Material Supplied: MV/LV/DC Cables/Cable Connectors/Earthing Materials

Year of Supplied: 2024

Location: Kenya

Description: The biggest challenge of this project was unexpected cost increase on raw material price & ocean freight.

LX signed the contract of the project in April, when copper/aluminum price in global metal market was experiencing historical shock by a 20% increase. This shock had significant impact on cost of the cables & accessories we were going to supply. What made it more challenging is before shipment, ocean freight had almost doubled.

However we took the challenge. Thanks to the great support of the management team and also the good relationship between LX and our reliable material suppliers, we got the best resources to be able to execute this contract without delay.

This case shows our ability to fight against potential risk in cost, which is essential to projects and tenders.

Get in Touch with Us

Discover how LX CABLE can support your next PV project or other power transmission projects with our comprehensive range of products and services.

Contact Us